California’s Title 24 energy requirements may require solar for your ADU, depending on your project. Metric Solar works with homeowners, builders, and architects to review your plans, determine the minimum solar system size required for your project, and coordinate the installation early in construction. We help you plan for code compliance, clean, concealed wiring, and fewer costly changes later.

New Construction & ADU Requirements

Planning a new Accessory Dwelling Unit (ADU) in Los Angeles? California’s Title 24 building and energy standards can require photovoltaic (PV) solar as part of a new ADU project. The required solar system depends on factors such as the ADU’s size, design, climate zone, and applicable code requirements.

 

Metric Solar helps homeowners, builders, and contractors install solar for ADU projects in Los Angeles, from initial planning through permitting and installation. We’ll help you understand the applicable Title 24 ADU solar requirements and design a PV system that works with your project.

Don’t wait until your ADU plans are ready for permit review to address solar. Metric Solar works with you early in the process so your PV system can be properly coordinated with the ADU design and energy requirements.

 

Whether you’re building an Accessory Dwelling Unit in Los Angeles, adding a detached ADU to your property, or working with a contractor on a new construction project, our team can help make the solar portion straightforward.

 

Ready to build your ADU? Call Metric Solar today to discuss your project and get started on your ADU solar system.

Junior ADU Projects

Solar for JADU in California: Know Before You Build

This part of Title 24 often goes unmentioned: a Junior ADU built within your existing home’s footprint, under 500 square feet, with no change to your roofline, is typically exempt from the solar mandate. If your project qualifies as a JADU, you may not need solar panels at all to get your permit approved.

Metric Solar reviews your solar requirements for ADU and JADU solar exemption in California status as part of our planning process, before anyone tells you solar is required:

If you qualify for the exemption, we’ll tell you. If you’d still like solar for the energy savings, JADU solar panel installation is straightforward to design once we know your electrical layout. Either way, you get a straight answer instead of a sales pitch.

Planned Into the Walls

The biggest cost difference in any solar ready new construction project comes down to timing. Run the conduit while the walls are open, and it disappears into the structure. Wait until after drywall, and that same conduit means cutting into finished walls, rerouting wiring, and paying for labor twice.

 

Metric Solar coordinates with your builder or electrician while framing and rough electrical are still in progress, delivering hidden conduit solar installation and solar pre-wire during construction before anything gets closed up:

Every wall that closes without a conduit becomes a future invoice. Catch it before it does.

One Call Before Framing Saves Thousands After

Invisible by Design

Every wire lives inside the walls because it was planned there from framing day one, not patched in after the fact.

Built for What Comes Next

Battery storage and EV charging are already wired in. When you're ready to upgrade, the walls stay closed, and the budget stays intact.

ADU & JADU Solar Panel Installation

What Your ADU or JADU Solar Project Includes

Do you want to live in a place full of comfort and convenience, where electricity is produced by itself and you also save on it? With us it can come true faster than you.

From Plans to Power, Step by Step

Title 24 Solar Assessment

We review your ADU plans to determine Title 24 solar requirements, including whether solar is required, the minimum system size, and the designated installation location.

Permits & Interconnection

We prepare the required solar plans, submit them for utility interconnection, and handle the necessary permitting to keep your project moving forward.

Pre-Construction Wiring

Before interior walls are enclosed, we coordinate with you or your contractor to pre-wire the required routes, ensuring the project is ready for a smooth solar installation.

Install & Activate

We install the solar system, coordinate the final inspection, and work with the utility company to obtain Permission to Operate (PTO), completing the project and activating your system.

Whether Title 24 requires solar on your project qualifies for an exemption, the right time to find out is now, while your plans are still on paper and your walls are still open. Metric Solar has coordinated solar planning for California builders, developers, and homeowners since 2016. Family-owned since day one, with no commission sales and a 25-year warranty covering both equipment and labor. Because promises on paper mean nothing without backup.

Frequently asked questions

The Quality of The Installation

All installers on our register present an excellent comparison of the quality of the services provided compared to the costs.

The Quality of The Installation

All installers on our register present an excellent comparison of the quality of the services provided compared to the costs.

What is a solar carport?

A solar carport is a meticulously structured parking shade that integrates solar panels on its rooftop to capture sunlight and convert it into electric energy efficiently. It is fundamentally a solar panel installation on the parking lots with integrated EV charging ports.

Usually, it takes approximately 6 to 12 weeks for a commercial solar carport installation and residential solar carports, it may take 2 weeks. However, the actual time for the solar carport installation depends on the number of EV charging integrations, the complexity of the solar installation project, and the scope of the project.

The size of your carport totally depends on the space size of your parking lot and your energy needs. One row of parking can be covered by stacking up three solar panels together, while two rows of parking can be covered by seven solar panels over the roof of one carport structure.

Commercial solar carport canopy can range from 10 – 14′ in height. However, the dimensions vary slightly on the type of chosen solar module.

Request a Free Estimate

Planning an ADU, or new construction project? Reach out early, and we'll make sure solar is part of the plan from day one, sized to code, wired before the walls close, and ready for whatever comes next.